QY-S12695 belongs to the Curved sofa range and is a curved sofa, 160 × 90 × 80 cm (W × D × H) as standard. Seat: High-density foam. Frame: Solid wood internal frame. Cover: Fabric, with leather or an alternative fabric available on request. Customisation covers size, radius, seat depth, configuration, upholstery; the final piece can be sized to the room, doorway and seating plan it is going into. Minimum order is 5 pieces per model with styles and fabrics mixable in one batch; lead time runs 15 days standard, 20 days customised and 30 days from a drawing. Common settings are hotel lobbies and suites, apartments, villas, lounge areas.
Available Configurations & Dimensions
| Configuration | Dimensions (W×D×H, cm) |
|---|---|
| Standard | 160×90×80 cm |
Construction & Supply
| Item | Specification |
|---|---|
| Frame | Solid wood internal frame |
| Filling | High-density foam |
| Upholstery | Fabric; alternative fabric or leather on request |
| Throw pillows | Included, matched to the upholstery |
| MOQ | 5 pieces per model, mixed styles and fabrics allowed |
| Lead time | 15 days standard / 20 days customisation / 30 days from drawing |
| Customisation | Size, radius, seat depth, configuration, upholstery |
| Typical use | Hotel lobby and suites, apartments, villas, lounge areas |
Construction, customisation and project use
QY-S12695 is a sofa group with high-density foam under fabric upholstery, built on a solid wood internal frame. Frame sections are cut, joined and braced across the seat deck before the upholstery goes on. Filling is built up in layers and wrapped as one unit, so the seat does not soften toward the frame. Size is customizable, and upholstery or finish is confirmed at quotation stage against the project schedule.
It sits in lobby groups and suite living areas, where the sofa sets the seating height for everything around it. The proportion is set from the seating around it rather than to a fixed catalogue dimension. It is usually set with a coffee table in front and two lounge chairs across, which fixes the depth the room needs.
Lead time is 15 / 20 / 30 days by scope, MOQ 5 pieces per model, mixed styles accepted in the same shipment. Each unit is checked for frame rigidity, joint alignment and surface finish before packing, then crated for project delivery. Send the room schedule and quantity, and we will return the confirmed specification.
Request a Quote for QY-S12695
Tell us the model number, quantity and destination port. Made to order in Foshan; MOQ 5 pieces per model, mixed styles allowed; lead time about 20 days.




















