About the QY-S1703
Built as a special-shaped sofa, QY-S1703 is produced to order in Foshan. It is made in a single standard size: 204×85×70 cm. It is built on a solid wood internal frame with high-density foam filling, and upholstered in fabric.
Specification highlights
- Frame: solid wood internal frame
- Filling: high-density foam
- Upholstery: fabric
Where it fits
At 2.04 m wide it needs a clear run of about 2.04 m plus circulation space in front.
Before you order
Every unit is made to order in Foshan, so there is no stock inventory – MOQ is 5 pieces per model and mixed styles are allowed. Lead time is stated as about 20 days. Size, configuration and upholstery can be customised; anything outside the listed options is reviewed against a drawing first.
Available Configurations & Dimensions
| Configuration | Dimensions (W×D×H, cm) |
|---|---|
| Standard | 204×85×70 cm |
Construction, customisation and project use
QY-S1703 is a seating unit with high-density foam under fabric upholstery, built on a solid wood internal frame. Frame sections are cut, joined and braced across the seat deck before the upholstery goes on. Filling is layered and pre-wrapped, so the cover sits flat instead of bridging across the foam. Any change after sign-off is handled as a revision, so the drawing on file always matches the build.
In a project it works as the seating anchor of the room, with side tables and lounge chairs around it. The footprint is confirmed against the room plan at quotation, since the listed size is a guide. In a suite it sits against the window wall, with the coffee table centred on the seat.
Lead time is about 20 days, MOQ 5 pieces per model, mixed styles accepted in the same shipment. Inspection covers frame, joints and finish, and each unit is crated for site delivery. Give us the model, quantity and destination port to receive a confirmed build sheet.
Request a Quote for QY-S1703
Tell us the model number, quantity and destination port. Made to order in Foshan; MOQ 5 pieces per model, mixed styles allowed; lead time about 20 days.



















