One order, every room type

A hotel enquiry rarely starts with a catalogue page. It starts with a photo, a plan, or a line in an FF&E schedule, and the first question is usually whether the piece can be made at the size the room needs.

This page is built around the questions buyers actually ask us on hotel orders — the same ones our sales team answers every week.

Typical brief

Send the room schedule, a plan or a reference photo with quantities and destination. We come back with the closest models, or a drawing for a new pattern.

Start a Project

What a hotel package includes

Upholstered seating is made in our own workshop in Shunde, Foshan. Dining chairs, tables, coffee tables and cabinets come from long-term partner workshops, matched to the same finish and the same fabric direction.

Hotel guest room with upholstered bed, daybed and desk, FEILIGE project

Guest rooms

Upholstered beds, bed benches, desk chairs and accent seating, sized per room type.

Hotel lobby in Xishuangbanna with lounge seating and side tables, FEILIGE project

Lobby & public areas

Modular and curved seating laid out to the plan, not to a catalogue footprint.

Hotel suite living room with modular sofa and coffee table, Xishuangbanna, FEILIGE project

Suites & club rooms

Curved sofas, lounge chairs and coffee tables as one matched group.

Twin hotel room with upholstered beds and lounge chair, Xishuangbanna, FEILIGE project

Serviced apartments

Seating, beds and casegoods packed by room so site delivery follows installation.

Questions buyers ask first

Grouped from the enquiries our sales team handles most often on hotel projects.

“Can you make this one?” — sent as a photo

Usually yes, and there are two routes. If a model in our 2000+ pattern library is close, we send it with the differences marked — arm width, back pitch, seat depth. If nothing is close, the piece is developed from your image or drawing, and we tell you at that stage what changes.

“Can the size be changed?”

Straight runs can be adjusted by the metre; chaise and return sections are usually fixed. Send the room length and the door or lift width, and we will confirm the largest piece that can be delivered and installed.

“What fabric can we choose?”

Chenille, technical fabric, linen blends, teddy, velvet and brushed fabrics are all in the sample library, and colours can be matched to a card or a reference. Composition, weight and abrasion are confirmed with the mill before a fabric is written into the specification.

“How long will it take?”

Three fixed cycles: about 15 days for standard models, 20 days for flexible customisation such as size, fabric or colour changes, and 30 days for a new frame built from a drawing. The clock starts at approved drawing and deposit, not at the enquiry date.

“Can you deliver and install?”

Export packing is included. Freight and installation are quoted separately by destination, and delivery with installation can be arranged. Large curved pieces can be built in sections for tight stair or lift access and joined on site.

“What if something arrives wrong?”

Every unit is inspected before packing, so the batch is checked before it ships. Frame and foam carry a three-year warranty against collapse and deformation under normal use. Quality issues are repaired or replaced; transit damage is handled together with the carrier.

“Can we see the goods before ordering?”

Yes. The showroom is in Longjiang, Shunde, Foshan, and visits are by appointment. Tell us which models you want to see and the samples will be set out before you arrive.

How the order is run

StageWhat happensTiming
Drawing reviewRoom schedule, dimensions and fabric confirmed against a drawing or referenceDay 0
Three-view drawingElevation, plan and side view approved before material is releasedBefore cutting
SamplePre-production sample where the project requires one; it becomes the reference for the batchBefore production
ProductionFrame, foam, upholstery and assembly at the production base in Shunde, Foshan15 / 20 / 30 days by scope
InspectionEvery unit checked — not a sample of the batchBefore packing
Packing & documentsExport packing, packing list, certificate of origin, timber quarantine documents where requiredBefore shipment

On-time delivery rate: 98%, with progress reported every three days through a dedicated group: supervisor, sales and merchandiser.

High-rise hotel suite in Xishuangbanna with upholstered bed and city view, FEILIGE project

A high-rise hotel in Xishuangbanna

Guest rooms, suites and the lobby of a high-rise hotel: upholstered beds, TV consoles, desks, curved sofas and lounge seating, all in one warm neutral scheme.

The case shows how four product categories were run on one schedule, and what was checked before each floor was released.

Read the case

Quality and compliance

What is checked on a hotel order, and what we will not claim without a report.

100%

Every unit inspected before packing, not an AQL sample. Pile direction, seam alignment and curve symmetry are checked piece by piece.

98%

On-time delivery across orders, with progress reported every three days.

3 years

Frame and foam warranty against collapse and deformation under normal use. Quality issues repaired or replaced; transit damage handled with the carrier.

ISO + fire

ISO 9001, 14001 and 45001 procedures. Foam tested to TB 117 and BS 5852; composite finished-piece testing arranged per project where the consultant requires it.

Tell us about the property

Send the room schedule or the reference. We reply within 24 hours on working days.

Request a Quote

Case notes in this programme

See all delivery notes on the projects page, or browse the product range.