The unit price covers export packing, not freight and not installation. Who pays for the container depends on the trade term you agree: EXW means the buyer collects from the factory, FOB means the seller delivers to the port of loading, CIF means the seller pays freight to the destination port, and DDP means the seller delivers to your door.
What the unit price includes
- Export packing: dust bag, corner protection, outer carton or woven bag
- Packing list with carton marks, volume and gross weight
- Certificate of origin and the documents needed for export
It does not include ocean freight, insurance, destination port charges, customs clearance or installation. Those are priced separately, and a quotation that does not say so is incomplete.
The four trade terms
| Term | Seller pays | Buyer pays | Usually chosen when |
|---|---|---|---|
| EXW | Packing and loading at the factory | All transport from the factory | Buyer has a forwarder in China |
| FOB | Delivery to the port of loading | Ocean freight and destination costs | The most common term for container orders |
| CIF | Freight and insurance to the destination port | Port charges, clearance and inland delivery | Buyer is new to shipping |
| DDP | Everything to the delivery address | Unloading at destination | Turnkey project with a single delivered price |
Container volume is the number that drives the freight quote, so it is agreed before booking. For how many pieces fit in a 40HQ and how packing changes the volume, see the container loading guide.
Who books the container
Under FOB the buyer books the container and the seller confirms the loading date and provides the packing list. Under CIF and DDP the seller books. Either way the loading window is set by production, and a booking made before the goods are packed usually ends up paying demurrage.
Installation and assembly
Furniture leaves the factory assembled where the piece allows it, with legs and hardware packed separately. Installation is not included in the unit price. For project orders we provide assembly instructions and the hardware schedule, and where a project needs on-site installation, it is quoted separately against the site address and the number of pieces.
What the quotation should state
- The trade term, spelled out rather than abbreviated alone
- Packing standard and whether crating is included
- Container type and the packed volume it assumes
- Whether insurance is included, and at what value
- Destination port or delivery address, and who clears customs
- Whether installation is included, and if not, the basis for quoting it
Frequently asked
Does the price include shipping?
No. The unit price includes export packing and the documents needed to ship. Freight depends on the trade term, the container volume and the destination.
Is packing included in the price?
Standard export packing is included: dust bag, corner protection and an outer carton or woven bag. A wooden crate or pallet, where the route needs one, is quoted separately because it carries its own treatment and weight.
Can you deliver to the project site?
Under CIF we deliver to the destination port; under DDP to the address you give. On-site delivery inside a building, floor by floor, depends on access and is agreed before shipment.
Is installation charged separately?
Yes. Assembly instructions and the hardware schedule come with the order. On-site installation is quoted against the site, the number of pieces and the access conditions.
Written by the FEILIGE project team · Updated 11 November 2026 · Reviewed against current production and shipping records.
Next: the six documents a hotel order runs on, or see furniture solutions by project type.

