A furniture factory audit answers seven questions, and only one of them is about machines. Check the legal entity, the equipment and process, the capacity and scheduling, the inspection records, the material and test evidence, the packing and storage, and the export documentation. A factory can pass the first six and still fail an order on the seventh.
The seven checks
| Check | What to ask for | What a weak answer sounds like |
|---|---|---|
| 1. Legal entity | Business licence, registered address, production scope | “We are the same company as the trading office” |
| 2. Equipment and process | Frame line, CNC, foam cutting, sewing, upholstery | “We outsource the frame” |
| 3. Capacity and scheduling | Monthly output, current load, lead time by model | “Whatever you need” |
| 4. Inspection records | Unit-by-unit check sheet, defect log, rework record | “We check before shipping” |
| 5. Material evidence | Foam density, fabric composition, test report numbers | “All certified” |
| 6. Packing and storage | Carton grade, corner protection, finished-goods area | “Standard export packing” |
| 7. Export documents | Packing list, certificate of origin, wood packaging mark | “The forwarder handles it” |
1. Legal entity
The entity on the business licence must match the entity on the contract and the bank account. A trading company and a factory in the same building are normal; what matters is that the document says which one is selling and which one is producing. Ask for the registered production scope, not just the registration number.
2. Equipment and process
Walk the line, not the showroom. For upholstered furniture the checks are the frame line, the CNC or template cutting for curved frames, foam cutting and shaping, sewing, and the upholstery stations. A curved sofa is the useful test case: if the frame is bent by hand rather than formed against a jig, the second unit will not match the first.
3. Capacity and scheduling
Ask for monthly output in pieces and the current load in weeks. A factory with 200,000 pieces per year of capacity and a two-week backlog can hold a 15-day standard lead time; the same factory with a six-week backlog cannot, whatever the quotation says. Lead time should be quoted from drawing confirmation and deposit, not from the enquiry date.
4. Inspection records
Ask to see the check sheet from yesterday, not a sample from last year. A working record has handwriting, dates, unit numbers and defect notes. The question is not whether defects exist — they always do — but whether there is a rework record that shows what happened next.
5. Material and test evidence
Ask for foam density and fabric composition per model, and for the test report numbers with dates. Evidence that is current, numbered and matched to the material in the run is worth more than a wall of certificates. The ISO management-system standards explain what a certificate covers; the report number is what ties it to your batch. Where a market requires specific upholstery performance, the report has to name the test and the result, not the word “certified”.
6. Packing and storage
Look at the finished-goods area. Pieces waiting for a container should be off the floor, corner-protected, and labelled by order. If finished goods are stacked on upholstery faces, the damage will not appear until the container is opened.
7. Export documents
Ask who prepares the packing list, the certificate of origin and the wood packaging mark. Wooden crates and pallets need the ISPM 15 treatment mark for most destinations, and this is a document check, not a quality check — a good factory can still lose a container here.
Red flags worth taking seriously
- The showroom is impressive and the workshop is not on the tour.
- Lead times are promised without asking about the drawing or the deposit date.
- Every question about material is answered with the word “certified”.
- Finished goods are stacked on their upholstery.
- Nobody can name the last container that left the building.
What an audit cannot tell you
An audit describes a process, not a batch. It cannot prove that the foam in your run matches the sample, that the fabric lot is consistent, or that the seam on unit 47 was checked. Those come from the inspection record and the sample approval sheet. Treat the audit as a filter and the records as the evidence.
Frequently asked
How long does a factory audit take?
Half a day covers the seven checks above for a single-site upholstery factory. Adding a finished-goods and packing review usually needs another two hours.
Should I audit the trading company or the factory?
Both, and for different reasons. The trading company holds the contract and the export documents; the factory holds the process and the records. On our side, FEILIGE is the sales and project service company and QIYU operates the manufacturing base in the same building.
What documents should I take away?
The business licence copy, the current load sheet, one recent inspection record, material specifications per model, and the packing standard. If any of those cannot leave the building, that is itself an answer.
Does a factory audit replace a pre-shipment inspection?
No. The audit is a one-off view of capability; the pre-shipment inspection is a per-order check against the approved sample. Every unit is checked before packing on our orders, and the record travels with the packing list.