About the QY-S126101
The QY-S126101 modular sofa belongs to the FEILIGE made-to-order range. It is made in a single standard size: 180×80×75 cm. It is built on a solid wood internal frame with high-density foam filling, and upholstered in fabric.
Where it fits
At 1.8 m wide it needs a clear run of about 1.8 m plus circulation space in front.
Key facts
- Frame: solid wood internal frame
- Filling: high-density foam
- Upholstery: fabric
Before you order
Every unit is made to order in Foshan, so there is no stock inventory – MOQ is 5 pieces per model and mixed styles are allowed. Lead time is stated as about 20 days. Size, configuration and upholstery can be customised; anything outside the listed options is reviewed against a drawing first.
Available Configurations & Dimensions
| Configuration | Dimensions (W×D×H, cm) |
|---|---|
| Standard | 180×80×75 cm |
Construction, customisation and project use
QY-S126101 is a sofa with high-density foam under fabric upholstery, built on a solid wood internal frame. The frame is a braced assembly rather than a panel box, which is what keeps the geometry stable under load. Filling is packed to the seam line, so the cover is held rather than pulled tight over the foam. The piece is made to order: size, configuration and finish are confirmed on a drawing before cutting starts.
In a project it works as the seating anchor of the room, with side tables and lounge chairs around it. The footprint is confirmed against the room plan at quotation, since the listed size is a guide. Where space is tight the same design is ordered shorter, and the pairing stays the same.
The run takes about 20 days; MOQ is 5 pieces per model, and models can be mixed within the order. Seat height, width and depth are measured on the finished unit before it is wrapped. Send the room schedule and quantity, and we will return the confirmed specification.
Request a Quote for QY-S126101
Tell us the model number, quantity and destination port. Made to order in Foshan; MOQ 5 pieces per model, mixed styles allowed; lead time about 20 days.





















