About the QY-S12608
QY-S12608 is a modular sofa. It is made in a single standard size: 260×100×66 cm. It is built on a solid wood internal frame with high-density foam filling, and upholstered in fabric.
Why specify this model
- Frame: solid wood internal frame
- Filling: high-density foam
- Upholstery: fabric
Where it fits
At 2.6 m wide it needs a clear run of about 2.6 m plus circulation space in front.
Before you order
Every unit is made to order in Foshan, so there is no stock inventory – MOQ is 5 pieces per model and mixed styles are allowed. Lead time is stated as about 20 days. Size, configuration and upholstery can be customised; anything outside the listed options is reviewed against a drawing first.
Available Configurations & Dimensions
| Configuration | Dimensions (W×D×H, cm) |
|---|---|
| Standard | 260×100×66 cm |
Construction, customisation and project use
QY-S12608 is a seating unit with high-density foam under fabric upholstery, built on a solid wood internal frame. Frame sections are cut, joined and braced across the seat deck before the upholstery goes on. Firmness is set per project rather than fixed, so a lobby and a guestroom can be specified differently. The piece is made to order: size, configuration and finish are confirmed on a drawing before cutting starts.
It suits residential living rooms and hospitality lounges where a full-length seat is needed. The footprint is confirmed against the room plan at quotation, since the listed size is a guide. Where space is tight the same design is ordered shorter, and the pairing stays the same.
Standard lead time is about 20 days; MOQ 5 pieces per model, mixed models allowed in one order. Each unit is checked for frame rigidity, joint alignment and surface finish before packing, then crated for project delivery. Send the room schedule and quantity, and we will return the confirmed specification.
Request a Quote for QY-S12608
Tell us the model number, quantity and destination port. Made to order in Foshan; MOQ 5 pieces per model, mixed styles allowed; lead time about 20 days.



















