About the QY-C2248
The QY-C2248 modular sofa belongs to the FEILIGE made-to-order range. It is made in a single standard size: 75×70×75 cm. It is built on a solid wood internal frame with high-density foam filling, and upholstered in fabric.
Where it fits
At 0.75 m wide it needs a clear run of about 0.75 m plus circulation space in front.
Key facts
- Frame: solid wood internal frame
- Filling: high-density foam
- Upholstery: fabric
Before you order
Every unit is made to order in Foshan, so there is no stock inventory – MOQ is 5 pieces per model and mixed styles are allowed. Lead time is stated as about 20 days. Size, configuration and upholstery can be customised; anything outside the listed options is reviewed against a drawing first.
Available Configurations & Dimensions
| Configuration | Dimensions (W×D×H, cm) |
|---|---|
| Standard | 75×70×75 cm |
Construction, customisation and project use
QY-C2248 is a sofa with high-density foam under fabric upholstery, built on a solid wood internal frame. The frame is built as a closed box with the corners blocked, so the load runs down the legs instead of through the seat. Filling is packed to the seam line, so the cover is held rather than pulled tight over the foam. Configuration is drawn to the room, and the finish is signed off before the first cut.
It sits in lobby groups and suite living areas, where the sofa sets the seating height for everything around it. The proportion is set from the seating around it rather than to a fixed catalogue dimension. It is usually set with a coffee table in front and two lounge chairs across, which fixes the depth the room needs.
Standard lead time is about 20 days; MOQ 5 pieces per model, mixed models allowed in one order. Frames, joints and finishes are checked unit by unit before packing and crating. Give us the layout, quantity and port and we will confirm what can be built.
Request a Quote for QY-C2248
Tell us the model number, quantity and destination port. Made to order in Foshan; MOQ 5 pieces per model, mixed styles allowed; lead time about 20 days.




















