Most hotel furniture problems are decided before the container arrives. The receiving inspection can only confirm what the specification, the sample and the packing allowed. This page is the checklist we use on project orders: what to sign off before production, what to check before shipment, and how to inspect room by room on arrival without turning a two-day job into two weeks.
The tolerances quoted on a project are agreed in the contract or the approved drawing. Where a figure is not fixed, it is marked “confirm per project” rather than assumed — an inspection checklist with made-up tolerances is worse than no checklist.
Stage 1 — before production
- Approved drawing per model, with dimensions in cm and the tolerance written next to it
- Fabric and foam references signed off, with physical swatches kept by both sides
- First-off sample approved for each model, including one curved or shaped piece if the project has any
- Room-by-room schedule: model, quantity, fabric, and which floor or room each piece belongs to
- Packing method agreed: carton spec, corner protection, legs detached or fitted, labels readable from outside the carton
Stage 2 — pre-shipment inspection
This is the inspection that decides whether a container ships. It is done at the factory, on the finished pieces, not on a sample.
| Check | Method | Record kept |
|---|---|---|
| Dimensions | Measure the agreed points on every piece in the sample set; tolerances per the approved drawing | Measurement sheet per model |
| Seat and back feel | Compare against the approved first-off sample by hand, not by photo | Signed sample reference |
| Cover work | Seam alignment, pattern direction, piping continuity, no shine at tight radii | Photo set per model |
| Frame and legs | Rock test, joint sound, leg attachment, levelling | Note per pallet |
| Labels and packing | Room or floor label visible, carton grade, corner protection in place | Loading list matched to cartons |
Stage 3 — receiving, room by room
Open one carton per model first, not one per room. Confirm the model matches the schedule, then work room by room against the list below. Photograph defects where they are found, with the room number in frame.
- Model and quantity match the room schedule; fabric matches the approved swatch
- Dimensions fit the space — check the piece in position, not in the corridor
- No transit damage: frame corners, legs, seam lines, and the base of the carton
- Legs fitted or supplied with the correct hardware count per piece
- Level: no rocking on a hard floor without adjustment
- Surface: no shine, no crushed pile, no stain from packing material
- Labels removed or retained as the project requires
How to grade what you find
| Grade | Examples | Typical route |
|---|---|---|
| Critical | Frame failure, wrong model, wrong fabric, piece unsafe to use | Do not install; replacement agreed with the supplier |
| Major | Visible seam misalignment, dimensional error beyond tolerance, transit tear | Repair or replace on a schedule agreed in writing |
| Minor | Loose label, carton scuff, hardware packed in the wrong bag | Fix on site; record for the next order |
Grade each finding before the installer leaves the room. A minor item logged on arrival is cheap to fix; the same item discovered after installation usually means moving furniture again.
Documents to keep
Approved drawings, the signed first-off sample record, the pre-shipment inspection sheet, the loading list, and the receiving photos with room numbers. On our side the material test reports sit on the certification page, and certificates are issued for the company while test reports relate to the specific models and materials in the order — that distinction matters when a consultant asks for “the certificate”.
For project orders
Our hotel and resort furniture page explains how a room schedule becomes a production plan, and the Thailand boutique hotel note shows what a 42-room schedule looks like in practice. The FAQ covers lead time and documents, and wholesale and project terms covers mixed orders across models and fabrics.