About the QY-S1648
Built as a special-shaped sofa, QY-S1648 is produced to order in Foshan. It is made in a single standard size: 240×125×43 cm. It is built on a solid wood internal frame with high-density foam filling, and upholstered in fabric.
Specification highlights
- Frame: solid wood internal frame
- Filling: high-density foam
- Upholstery: fabric
Where it fits
At 2.4 m wide it needs a clear run of about 2.4 m plus circulation space in front.
Before you order
Every unit is made to order in Foshan, so there is no stock inventory – MOQ is 5 pieces per model and mixed styles are allowed. Lead time is stated as about 20 days. Size, configuration and upholstery can be customised; anything outside the listed options is reviewed against a drawing first.
Available Configurations & Dimensions
| Configuration | Dimensions (W×D×H, cm) |
|---|---|
| Standard | 240×125×43 cm |
Construction, customisation and project use
QY-S1648 is a sofa group with high-density foam under fabric upholstery, built on a solid wood internal frame. Joint work is done before upholstery, which is why the rails are measured again once the frame is assembled. The cushion is wrapped before the cover goes on, which keeps the fibre from shifting inside the seam. Colour and texture are approved from a sample, so the batch matches what was signed off.
It sits in lobby groups and suite living areas, where the sofa sets the seating height for everything around it. The footprint is confirmed against the room plan at quotation, since the listed size is a guide. In a suite it sits against the window wall, with the coffee table centred on the seat.
Production is scheduled for about 20 days against a confirmed drawing, MOQ 5 pieces per model. Units are inspected for frame square, joint tightness and finish consistency before crating. Send the room schedule and we will return the configuration that fits it.
Request a Quote for QY-S1648
Tell us the model number, quantity and destination port. Made to order in Foshan; MOQ 5 pieces per model, mixed styles allowed; lead time about 20 days.





















