About the QY-C2203
The QY-C2203 lounge chair belongs to the FEILIGE made-to-order range. It is made in a single standard size: 76×88×82 cm. It is built on a stainless steel base with high-density foam filling, and upholstered in fabric.
Where it fits
At 0.76 m wide it needs a clear run of about 0.76 m plus circulation space in front.
Key facts
- Frame: stainless steel base
- Filling: high-density foam
- Upholstery: fabric
Before you order
Every unit is made to order in Foshan, so there is no stock inventory – MOQ is 5 pieces per model and mixed styles are allowed. Lead time is stated as about 20 days. Size, configuration and upholstery can be customised; anything outside the listed options is reviewed against a drawing first.
Available Configurations & Dimensions
| Configuration | Dimensions (W×D×H, cm) |
|---|---|
| Standard | 76×88×82 cm |
Construction, customisation and project use
QY-C2203 is a lounge chair with high-density foam under fabric upholstery, built on a stainless steel base. The frame stays visible only at the base and legs, so the joinery is kept tight rather than decorative. The cushion is wrapped before the cover goes on, which keeps the fibre from shifting inside the seam. Where a layout already exists, the piece is adjusted to it rather than the room being built around it.
It works as a reading chair or a second seat pulled up to a sofa, which is how lounge chairs are actually used. The footprint is confirmed against the room plan at quotation, since the listed size is a guide. It is usually placed at an angle to the sofa rather than square to it, so the two seats face each other.
Production is booked at about 20 days from drawing sign-off, with MOQ 5 pieces per model. Every piece is checked for alignment, finish and fitting before it is wrapped and crated. Give us the layout, quantity and port and we will confirm what can be built.
Request a Quote for QY-C2203
Tell us the model number, quantity and destination port. Made to order in Foshan; MOQ 5 pieces per model, mixed styles allowed; lead time about 20 days.



















