About the QY-T82520
QY-T82520 is a dining table from the FEILIGE made-to-order range. The listed size is 200 x 90 x 75 cm. Construction: Desktop: Natural large-flowered green marble; Base: Solid ash wood.
Why specify this model
- Listed dimensions: 200 x 90 x 75 cm
- Construction: Desktop: Natural large-flowered green marble; Base: Solid ash wood
- MOQ: 5 pieces per model, mixed styles allowed
- Lead time: about 20 days
Where it fits
At 2.00 m long it suits dining rooms in hotels, serviced apartments and residential projects.
Before you order
Every unit is made to order in Foshan, with no stock inventory; MOQ is 5 pieces per model and mixed styles are allowed. Lead time is about 20 days. Size, configuration and upholstery can be customised against a drawing.
Available Configurations & Dimensions
| Configuration | Dimensions (W×D×H, cm) |
|---|---|
| Standard | 200×90×75 cm |
| Size 2 | 220×100×75 cm |
| Size 3 | 240×100×75 cm |
Construction, customisation and project use
QY-T82520 is a dining table with a finished structural body, built on a solid wood frame. Where the span is long, the frame is braced across the middle rather than stiffened at the ends only. The piece is unupholstered and finished directly, which keeps the material reading honest. Colour and texture are approved from a sample, so the batch matches what was signed off.
It is used in hospitality dining rooms where the same top may be ordered for several floors. It measures 200×90×75 cm as listed, with the size open to adjustment on a drawing. Against a banquette the back edge is kept plain so the table sits tight to the wall.
Standard lead time is about 20 days; MOQ 5 pieces per model, mixed models allowed in one order. Every piece is checked for alignment, finish and fitting before it is wrapped and crated. Give us the model, quantity and destination port to receive a confirmed build sheet.
Request a Quote for QY-T82520
Tell us the model number, quantity and destination port. Made to order in Foshan; MOQ 5 pieces per model, mixed styles allowed; lead time about 20 days.

















