About the QY-T736A
Built as a coffee table, QY-T736A is produced to order in Foshan. The listed size is 120 x 70 x 36 cm. It is offered in 2 size and layout options, each listed with its own width, depth and height. It is upholstered in natural stone or wood veneer top.
Where it fits
At 1.2 m wide it needs a clear run of about 1.2 m plus circulation space in front.
Key facts
- Listed dimensions: 120 x 70 x 36 cm
- 2 documented size and layout options
- Upholstery: natural stone or wood veneer top
Before you order
Every unit is made to order in Foshan, with no stock inventory; MOQ is 5 pieces per model and mixed styles are allowed. Lead time is about 20 days. Size, configuration and upholstery can be customised against a drawing.
Available Configurations & Dimensions
| Configuration | Dimensions (cm) |
|---|---|
| Standard | Φ70×H36 cm |
| Option 1 | Φ450×H460 cm |
Construction, customisation and project use
QY-T736A is a low table with natural stone or wood veneer top upholstery, built on a braced internal frame. The frame is assembled from solid sections with blocked corners, which keeps the arms and back square in use. Filling is built up in layers and wrapped as one unit, so the seat does not soften toward the frame. Models in the same family can share a finish, which keeps a project reading as one specification.
It is used beside sofas and between lounge chairs, where the surface needs to be stable rather than large. The footprint is confirmed against the room plan at quotation, since the listed size is a guide. It is set in front of the sofa at a reachable distance, not against the chairs.
Production is scheduled for about 20 days against a confirmed drawing, MOQ 5 pieces per model. Every piece is checked for alignment, finish and fitting before it is wrapped and crated. Send the room schedule and quantity, and we will return the confirmed specification.
Request a Quote for QY-T736A
Tell us the model number, quantity and destination port. Made to order in Foshan; MOQ 5 pieces per model, mixed styles allowed; lead time about 20 days.



















