About the QY-C2915
Built as a lounge chair, QY-C2915 is produced to order in Foshan. It is made in a single standard size: 90×85×72 cm. It is built on a solid wood internal frame with high-density foam filling, and upholstered in fabric.
Specification highlights
- Frame: solid wood internal frame
- Filling: high-density foam
- Upholstery: fabric
Where it fits
At 0.9 m wide it needs a clear run of about 0.9 m plus circulation space in front.
Before you order
Every unit is made to order in Foshan, so there is no stock inventory – MOQ is 5 pieces per model and mixed styles are allowed. Lead time is stated as about 20 days. Size, configuration and upholstery can be customised; anything outside the listed options is reviewed against a drawing first.
Available Configurations & Dimensions
| Configuration | Dimensions (W×D×H, cm) |
|---|---|
| Standard | 90×85×72 cm |
Construction, customisation and project use
QY-C2915 is a lounge chair with high-density foam under fabric upholstery, built on a solid wood internal frame. The frame is assembled from solid sections with blocked corners, which keeps the arms and back square in use. The cushion is wrapped before the cover goes on, which keeps the fibre from shifting inside the seam. Models in the same family can share a finish, which keeps a project reading as one specification.
It suits rooms where the chair is moved between the window and the seating group. The footprint is confirmed against the room plan at quotation, since the listed size is a guide. It is usually placed at an angle to the sofa rather than square to it, so the two seats face each other.
The run takes about 20 days; MOQ is 5 pieces per model, and models can be mixed within the order. Seat height, width and depth are measured on the finished unit before it is wrapped. Give us the model, quantity and destination port to receive a confirmed build sheet.
Request a Quote for QY-C2915
Tell us the model number, quantity and destination port. Made to order in Foshan; MOQ 5 pieces per model, mixed styles allowed; lead time about 20 days.





















